We design and install custom PV systems, assessing roof load, orientation (south-facing ideal for 15–20% more yield), and shading. Process includes mounting structures (aluminum rails), wiring with MC4 connectors, and grid synchronization. Timeline: 1–3 days for residential, 1–2 weeks for commercial.
We design and install custom PV systems, assessing roof load, orientation (south-facing ideal for 15–20% more yield), and shading. Process includes mounting structures (aluminum rails), wiring with MC4 connectors, and grid synchronization. Timeline: 1–3 days for residential, 1–2 weeks for commercial.
Details: Includes site survey, permit assistance, and commissioning with net meter setup. Safety protocols: Grounding, surge protection, and compliance with CEA guidelines. Post-install: 1-year workmanship warranty.Timeline: 1–3 days for residential, 1–2 weeks for commercial.
Details: Includes site survey, permit assistance, and commissioning with net meter setup. Safety protocols: Grounding, surge protection, and compliance with CEA guidelines. Post-install: 1-year workmanship warranty.